Followers

Apr 6, 2017

[CA] UP Farm Loan waiver

     As promised in election manifesto, the BJP government, in its first cabinet meeting waived crop loan of around 86 lakh small and marginal farmers of the state, incurring a total expenditure of over Rs.36,000 crore. In another farmer-friendly decision, the Yogi government also decided to set up 5,000 wheat purchasing centres across UP.
       Announcing the decision after 90-minute meeting, Cabinet Minister Siddharth Nath Singh said that loans up to Rs.1 lakh taken by small and marginal farmers, with land holding of less than 5 acre -till March 31, 2016 would be waived.

      Additionally, the cabinet also decided to give the benefit of one-time settlement to 7 lakh farmers whose old loans had been declared non-performing assets by the banks.

Apr 4, 2017

[CA] March 2017 Current Affairs



MARCH 2017 CURRENT AFFAIRS
[only in ENGLISH]



Rs. 100/ - (Printed Materials)
Rs. 75 / - (Pdf) 



If needed mail to ss.currentaffairs@gmail.com senthilkumar.murugesan.klk@gmail.com



Apr 3, 2017

[CA] India's longest tunnel

Prime Minister, Mr. Narendra Modi, (on April 02,2017) dedicated to the nation, India’s longest road tunnel – the 9 kilometre long “Chenani – Nashri Tunnel” – on April 02, 2017.  The tunnel on NH-44 which connects Jammu with Srinagar, will reduce travel time between the two cities by upto two hours. It achieves a distance-reduction of 31 kilometres, bypassing snow-bound upper reaches. The estimated daily fuel savings are to the tune of Rs. 27 lakhs.
Besides avoiding large scale deforestation and tree-cutting, the tunnel will provide a safe, all-weather route to commuters travelling from Jammu and Udhampur, to Ramban, Banihal and Srinagar.
The tunnel is equipped with world-class security systems, and is expected to boost tourism and economic activities in the State of Jammu and Kashmir.

Key Features of the tunnel
• It is a single-tube bi-directional tunnel, with a 9.35 metre carriageway, and a vertical clearance of 5 metres.
• There is also a parallel escape tunnel, with “Cross Passages” connecting to the main tunnel at intervals of 300 metres.
• It also has smart features such as an Integrated Traffic Control System; Surveillance, Ventilation and Broadcast Systems; Fire Fighting System; and SOS call-boxes at every 150 metres.

• The project has been completed at a cost of over Rs. 2500 crore